Seattle’s lotsare failing.We’re replacing them.
Full-depth replacement, overlay, and patch crews operating across the Puget Sound’s narrow May–October dry window. We show up on schedule or we don’t bill.
Paved This Season
Across 94 commercial lots in King & Snohomish County
Avg. Project Turnaround
From mobilization to final compaction, median 2026 season
Dry-Window Completion
Jobs finished May–Sept, within optimal curing conditions
Diagnose your lot.
Three service tiers, four decision factors. Find your column, read down, and know what you need before you call anyone. Seattle’s wet winters punish the wrong choice.
Patch & Seal
Crack fill + sealcoat
- Isolated surface cracks only
- Budget maintenance cycles
- Pre-sale cosmetic refresh
Asphalt Overlay
1.5"–2" new wearing surface
- Sound base, surface wear only
- Strip mall entrances & drives
- Lots 15–20 years old, intact base
Full-Depth Replacement
Remove, regrade, rebuild
- Widespread alligator cracking
- Standing water & drainage failure
- Heavy semi-truck traffic areas
Not sure which column you’re in?
If you see water standing more than 30 minutes after rain stops, or cracks wider than a quarter-inch, you’re past patch-and-seal. Fill out the assessment below — we’ll tell you exactly what your lot needs, in writing, within 48 hours.
Get Your Lot Assessed.
Fill this out. We’ll send a written scope-of-work within 48 hours — no phone tag, no vague estimates.
Before & After.
With the numbers.
Every project is documented with square footage, turnaround time, drainage improvement, and grade correction. Toggle between before and after states.
Aurora Avenue Strip Mall
North Seattle, WA


SODO Warehouse Yard
SoDo Industrial, Seattle


Kirkland Office Park HOA
Kirkland, WA
Seattle Property Manager’s
Paving Guide
Dry-season scheduling windows, cost benchmarks by lot type, how to read a paving bid, and what questions separate a legit crew from a low-baller. Written for King & Snohomish County property managers.
- Overlay vs replacement decision flowchart
- Seattle dry-window calendar (May–Oct)
- Cost-per-sq-ft benchmarks for 2026
- Red flags in paving contracts
Download Free Guide
Enter your work email. No spam — just the PDF and occasional project updates from Blacktop.
Ready to stop patching and start replacing?
We’re booking the 2026 May–October window now. Slots fill by March.